An opening and closing checklist is the list of things that must be true before the first customer walks in and after the last one leaves. It turns "did anyone clean the grinder?" into a tick with a name beside it. Below is a free checklist for a coffee shop with 25 tasks, grouped by shift and station, and a column for each day of the week. No signup.
Download the checklist
Download the free opening and closing checklist (CSV) →
It opens in Google Sheets, Excel or Numbers. Print one sheet a week, or keep it on the phone behind the bar. The tasks are a starting point: cut what you do not do, add what you do.
| Column | What goes in it |
|---|---|
| Shift | Open or Close |
| Station | Bar, Kitchen or Front |
| Task | One thing, written so a new hire could do it |
| Mon to Sun | Initials when the task is done |
| Notes | Anything the next shift should know |
Opening: what is on the list
- Bar. Machines and grinders on, espresso dialled in and tasted, first batch of drip brewed, milk, syrups, cups and lids stocked, ice bins filled.
- Kitchen. Fridge and freezer temperatures checked and written down. The prep list checked, and anything below par started.
- Front. Pastries and food set out with dates checked, the till float counted, toilets checked, lights and music on, door unlocked.
Closing: what is on the list
- Bar. Espresso machine cleaned (backflush, steam wands, drip tray), grinders and knock box emptied, pitchers and tools washed, milk and open syrups dated and put away, cups and lids restocked for the morning.
- Kitchen. Leftover food labelled and stored; anything past its date thrown away and written on the waste log. Tomorrow's prep list written. Fridge and freezer temperatures written down again.
- Front. Tables, counters and pastry case wiped, floors swept and mopped, rubbish and recycling out, till cashed up, and a note of what is running low for the next order.
Your local food safety rules decide the safe temperature range and how long food may be kept. Write those limits at the top of the sheet so nobody has to remember them.
How to make the checklist stick
- Write each task so a new hire could do it. "Clean the bar" is not a task. "Backflush the espresso machine" is.
- Put the tasks in the order people walk. Bar, then kitchen, then front, or whatever your shop's path is.
- Ask for initials, not ticks. A tick says it was done. Initials say who to ask when it was not.
- Read last night's Notes column every morning. It is the handover.
- Change the list when the shop changes. A new machine, a new menu item or a new opening hour all mean a new line.
Where a paper checklist stops
A paper checklist cannot tell you on Thursday that Tuesday's close was skipped. Somebody has to read the sheets.
QuickStok has the same checklist as To Dos: tasks by station and weekday, for opening, closing and cleaning. Staff tick them on the same link they count stock on, with no account to create. You see who did what and when, and the week at a glance. Fridge and freezer temperatures can be typed in as a task, and readings outside the range are flagged.
Three limits to know. Tasks are set by weekday, not by time of day. It sends no reminders. And it is not a food safety compliance product: it records what your team types.
It is free for one café, and it does not expire. No credit card.
If the clipboard works for your team, keep it. Every other free sheet, from the count sheet to the order guide, is on the templates page.
Frequently asked questions
What should be on a coffee shop opening checklist?
The machines on and the espresso dialled in, the first batch of coffee brewed, the bar stocked with milk, syrups, cups and lids, fridge temperatures written down, food set out and dates checked, the till float counted, and the door unlocked.
What should be on a coffee shop closing checklist?
The espresso machine and grinders cleaned, milk and open syrups dated and put away, leftover food labelled or thrown away and logged, the bar restocked for the morning, floors and tables cleaned, rubbish out, the till cashed up, and a note of what is running low for the next order.
How long should opening and closing take?
It depends on the shop. Time your own team for a week with the checklist in hand, then use that as the target. If one task takes far longer than the rest, it is usually the one to move to a quieter time of day.
Should the checklist be on paper or on a phone?
Whichever your team will fill in. Paper on a clipboard is hard to ignore; a phone keeps a record of who ticked what and when. The template works as either: print it, or open it on a phone.